With the future moving towards Automatic Train Control, Gioconda are increasingly outputting Track Centreline data as a by product from our other services.
Using GPS, correlated to Drivers video footage, we can supply
- Raw Track Centreline 10hz readings
- Processed Track Centreline at up to 0.1m spacings
- Processed to remove ambiguous points
- Smoothed vertical alignment
- Densified point spacings
- Grade and Curvature measurements
- Linear datum references
Delivered as CSV, eXcel, CAD layout and Google overlay.